-
-
SX5D1-AEOT-14
-
SX5D1-AEOT-14
-
SX5D1-AEOT-14
-
SX5D1-AEOT-14
-
SX5D1-AEOT-14
-
SX5D1-AEOT-14
-
Data Concentrator Unit
DCU
SX5D1-AEOT-14 data concentrator unit is a key device in AMI system, with strong functionality, edge of computing and storage capability.It can not only work as a gateway for collecting data from electronic, gas, heat and water meters, but also support meter's data storage. Uplink with system through various kinds of remote communication technology. Downlink support PLC/RF/RS485,which can help customers decrease communication cost. With advanced technology,it can achieve automatic networking,support flexible data collection scheme to improve KPI performance. More important, it supports measurement function so that can work as a balance meter and calculate line loss easily.
Certificate
Contact Us
Detailed parameters
Key
Feature
ARM9 CPU Core,Linux OS
512MB Flash
Accuracy up to Cl.0.5S[active energy] and Cl.2 [reactive energy]
Lattice LCD(optional)
Wide operating voltage range(90V to 400V)
Multiple communicate type
Functions
Multi-protocol library
DLMS secure suite 0/1,TLS
Interchangeable modules
WEB server(data reading/control, parameter setting)
Automatic networking(up to 1000 meters)
Flexible data collection scheme to improve KPI
Support balance meter
Housing
Installation standard according to BS
Polycarbonate with glass fibre,flame retardant and heat-proof
IP54
Case Study
-
Nigeria Smart Metering Case
In 2016, Ningbo SANXING Smart Electric Co., Ltd. launched its venture into the Nigerian market, embarking on a collaborative project on the electricity meters with Mojec, the leading local metering manufacturer in Nigeria. This partnership has successfully filled a market gap for SANXING in the Nigerian market.
Learn more
-
Saudi Arabia Smart Metering Case
Challenges of Saudi Electricity Company (SEC) before the Smart Metering Project: Manual Meter Reading: Prior to smart meters, SEC relied on manual meter readings. This process was labor-intensive, time-consuming, and prone to human error, leading to inaccurate billing and delays.
Learn more
-
China Smart Metering Case
Smart meters are not fully covered, and the collection rate is low.
Learn more
-
Latvia Smart Metering Case
Sanxing has won three projects in Latvia, and has implemented a total of 800,000 G3-PLC smart meters since 2017, accounting for 80% of the overall market capacity. This project is the first large-scale deployment of the G3-PLC overall solution in Northern Europe. This solution covers the entire country of Latvia, from electricity meters, concentrators to HES, KMS, to MDM interface and project management, all of which are handled by Sanxing.
Learn more
-
Brazil Smart Metering Case
Challenges of Saudi Electricity Company (SEC) before the Smart Metering Project: Manual Meter Reading: Prior to smart meters, SEC relied on manual meter readings. This process was labor-intensive, time-consuming, and prone to human error, leading to inaccurate billing and delays.
Learn more
-
Sweden Smart Metering Case
Sweden's national smart meter rotation requires high signal strength
Learn more
Related Products
-
U26/U28 Series
Active
Cl.1
Reactive
Cl.2
Voltage
220V/230V/240V
Learn more
-
U18(High Accuracy-0.2S)
Active
Cl.0.2
Active
Cl.2
Voltage
3×63.5/110V to 3×230V/400V
Learn more
-
S01/S02 Series
Active
Cl.1
Reactive
Cl.2
Voltage
220V/230V/240V
Learn more
-
Learn more
-
Learn more
-
U16/U18 Series
Active
Cl.1/Cl.B
Reactive
Cl.2
Voltage
220V/230V/240V
Learn more